Virginia's Phase II Watershed Implementation Plan
photo of loudoun county streamLatest News

Virginia submitted its Phase II Watershed Implementation Plan to the EPA on March 30, 2012.  Virginia is providing a 60-day public comment period ending on May 31, 2012.  Instructions for submitting comments and a copy of the Phase II WIP can be found online: Public Comment Period. 

April 2012 Transportation and Land Use Committee Item: Item 4 Phase II WIP

January 2012 Board Documents Online:  


As directed by the Loudoun County Board of Supervisors, staff has provided information to the Virginia Department of Conservation and Recreation (DCR) to support the development of Virginia’s Phase II Watershed Implementation Plan (WIP II).  Each state with waters draining to the Chesapeake Bay is required to submit a WIP which proposes how the state will meet pollution reduction goals set by the Environmental Protection Agency, known as the Chesapeake Bay Total Maximum Daily Load (TMDL).  The TMDL is intended to limit the amount of phosphorus, nitrogen and sediment entering the Chesapeake Bay from its watershed.

Loudoun County has provided DCR with pollution control measures or Best Management Practices (BMPs) that are not already accounted for in DCR databases.  Examples of these BMPs include septic system pump-outs and stormwater pollution control systems.  Loudoun County also provided DCR with land cover information such as forest cover. The information submitted to DCR is online:

In WIP II, states will be required to disseminate pollution load limits to local jurisdictions and submit strategies for meeting the pollution reduction goals as well as milestones that will be used to gauge progress and guide plan changes.  

The Watershed Improvement Plan item prepared for the Board of Supervisors meeting of September 7, 2011, is online:

 
Key dates: 

March 30, 2012: Final Virginia Phase II WIP provided to the EPA
May 31, 2012: End of Virginia Phase II WIP Public Comment Period

Online Resources

  • Loudoun County Virginia Cooperative Extension

For More Information

Contact Alan Brewer, Loudoun County Energy and Environmental Program and Policy Administrator, 571-258-3444 or .