Evergreen Mills Road Realignment Public Information Meeting

September 22, 2020, 6:00 - 7:30 p.m. via Webex

This webpage provides information to assist you in understanding the traffic and safety design issues being considered on Evergreen Mills Road at the intersections of Reservoir Road and Watson Road. In the tabs below, you can view and download meeting materials; sign up to speak during the live portion of the meeting; and leave a comment.

About the Project

The Evergreen Mills Road Realignment project provides for the planning, design, right-of-way acquisition, and construction of the realignment of Evergreen Mills Road at the intersections of Reservoir Road and Watson Road. The improvements propose a new four-way signalized intersection between Evergreen Mills Road, Watson Road and Reservoir Road which will improve traffic operations, lines of sight, and safety along this segment of the road. 

The purpose of this project is to provide an interim improvement that will enhance traffic operations, congestion and roadway safety throughout the project limits.  This project will widen existing Evergreen Mills Road approximately 0.10 miles south of Reservoir Road to the southern end of the Goose Creek bridge, and construct a new signalized intersection with the realigned Watson Road at the existing Reservoir Road location. The improvements will focus on providing safety within this section of the Evergreen Mills Road corridor. The project will also include the installation of stormwater management measures, reconstruction of existing drainage facilities, additional grading to accommodate the future widening of Evergreen Mills Road, utility relocations, improving sight distance and other ancillary improvements. This $25 million project is funded through the Northern Virginia Transportation Authority (NVTA), proffers and local taxes.

To stay informed about the Evergreen Mills Road Realignment project and design and construction updates

  1. Exhibit Materials
  2. Public Meeting Details
  3. Participant Q&A Sign-Up
  4. Submit a Comment

Exhibits & Displays

The exhibits and materials provided below provide an overview of the project based on the current preliminary design. The materials below also include project details, project description and the anticipated project schedule. Please review the information prior to participating in the public input meeting.

Evergreen Mills Road Improvements - Project Overall Exhibit

Evergreen Mills Road – Proposed Typical Section 

Watson Road - Proposed Typical Section

Watson Road Turn Lane - Proposed Typical Section

Reservoir Road – Proposed Typical Section

Project Overview Brochure

Land Acquisition Support Documents  - VDOT – A Guide for Property Owners and Tenants  

Notice of Electronic Meeting: Due to the ongoing COVID-19 Pandemic, this public meeting will be conducted as an electronic meeting under the Continuity Ordinance adopted by the Board of Supervisors on April 15, 2020.