Route 50 and Trailhead Drive Roundabout

Overview

  • This project provides for the planning, design, right of way (ROW) acquisition, and construction of a roundabout at the intersection of John Mosby Highway (Route 50) and Trailhead Drive (Route 3395) in Aldie, Virginia.
  • The roundabout will be constructed as a hybrid roundabout, with the potential for future expansion. The scope includes two westbound lanes to provide for left turning and through/right turning traffic. The northbound approach from Trailhead Drive will include a bypass lane to eastbound Route 50.
  • The project budget includes proffers, General Obligation Bonds and Local Tax funding.

Current Phase: Design - 90% Design Plans

Estimated Timeline

  • Fall 2019 - Spring 2023: Design
  • Spring 2023 - Winter 2024: Right of Way
  • Winter 2024 - Fall 2024: Utilities Relocation
  • Fall 2024 - Winter 2025: Construction
  • Winter 2025: Substantial Completion