Go To Search
Click to Home
Site Tools
Applications
What do I need to make an application?
A completed Land Development Application form is available from the Department of Building and Development. This includes:
 
  • A minimum submission checklist of required items to be submitted;
  • A site plan prepared by a professional engineer in accordance with the Administrative Procedures chapter of the Facilties Standards Manual (FSM);
  • A filing fee based on the current fee schedule with the check made out to Loudoun County.

How do I apply for a Site Plan?

If you have never submitted a site plan application in Loudoun County, it is recommended that a pre-application meeting be arranged through the county's Chief Engineer in the Department of Building and Development.

Submit a completed Land Development Application, ten copies of the site plan, and the fee check to the Department of Building and Development.

Department of  Building & Development
1 Harrison Street, S.E.
Mailstop #60
Leesburg, VA 20175
Directions
Phone: 703-777-0220
email

Loudoun On
Site Tools